One Master ITP, 17 Trade Checklists, Already Structured
Stop rebuilding your Inspection & Test Plan from scratch on every project — Hold, Witness, and Review points already mapped, trade by trade.
The Problem
Every new project usually means rebuilding the ITP structure again — deciding which activities need a Hold vs. a Witness point, cross-checking reference standards, and building out trade checklists before inspections can even start.
The Solution
One master ITP matrix ties 17 individual trade checklists together — survey through external works — with Hold/Witness/Review points, acceptance criteria, and reference standards (ACI, ASTM, ISO, IEC, BS, AASHTO, SMACNA, NFPA) already built in.
What You Receive
What You Receive
- Editable Excel workbook (.xlsx), 19 tabs
- Print-ready PDF version
- Getting Started guide
- License for use across your own projects
What’s Inside
- COVER tab with project identification fields
- MAIN ITP tab — master matrix with Hold/Witness points, acceptance criteria, reference standards, Contractor/Consultant/Client sign-off columns
- 17 trade checklists: Survey, Setting Out, Earthworks, Lean Concrete, Rebar, Concrete, Final Inspection, Electrical, HVAC, Plumbing, Plastering, Painting, Tiling, Ceiling, Aluminium, Fire Doors, External Works
- Each checklist: YES / NO / N/A inspection items, Remarks column, Contractor/Consultant sign-off lines
Make It Yours in Minutes
Open the File
It’s a fully editable Excel workbook — no locked cells to fight.
Add Project Details
Fill in Project Name, Project No., Contractor, Consultant, Client/Owner, and Location on the Cover tab.
Set Each Checklist
Every one of the 17 trade tabs has its own Project / Location / Date / Contractor / Activity Ref. line.
Start Inspecting
Work through Hold/Witness points as each trade activity comes up.
Start From a Structured Base, Not a Blank Page
Start from a structured 19-tab workbook instead of building 17 trade checklists and cross-referencing standards one at a time.
How It Fits Into the QA/QC Workflow
Part of one coordinated system — plan the inspection, carry it out, document what’s found, track it, and close it out.
PLAN
QA/QC ITP Package structures Hold, Witness & Review points before work starts.
INSPECT
Field Guide checklists guide the inspection itself, trade by trade.
IDENTIFY
NCR Form or QOR Form documents what was found, in the field.
TRACK
NCR Log or QOR Log tracks status and days-open automatically, project-wide.
CLOSE OUT
Verified sign-off closes the loop — on record, at project closeout.
Who It’s For
Product Preview
Cover preview shown. Full contents unlock after purchase on Whop.
QA/QC ITP Package Premium
$47.99
