QA/QC ITP Package Premium

Inspection & Test Planning

One Master ITP, 17 Trade Checklists, Already Structured

Stop rebuilding your Inspection & Test Plan from scratch on every project — Hold, Witness, and Review points already mapped, trade by trade.

$47.99 Editable Excel (.xlsx) + PDF · 19 tabs

The Problem

Every new project usually means rebuilding the ITP structure again — deciding which activities need a Hold vs. a Witness point, cross-checking reference standards, and building out trade checklists before inspections can even start.

The Solution

One master ITP matrix ties 17 individual trade checklists together — survey through external works — with Hold/Witness/Review points, acceptance criteria, and reference standards (ACI, ASTM, ISO, IEC, BS, AASHTO, SMACNA, NFPA) already built in.

What You Receive

What You Receive

  • Editable Excel workbook (.xlsx), 19 tabs
  • Print-ready PDF version
  • Getting Started guide
  • License for use across your own projects

What’s Inside

  • COVER tab with project identification fields
  • MAIN ITP tab — master matrix with Hold/Witness points, acceptance criteria, reference standards, Contractor/Consultant/Client sign-off columns
  • 17 trade checklists: Survey, Setting Out, Earthworks, Lean Concrete, Rebar, Concrete, Final Inspection, Electrical, HVAC, Plumbing, Plastering, Painting, Tiling, Ceiling, Aluminium, Fire Doors, External Works
  • Each checklist: YES / NO / N/A inspection items, Remarks column, Contractor/Consultant sign-off lines

Make It Yours in Minutes

1

Open the File

It’s a fully editable Excel workbook — no locked cells to fight.

2

Add Project Details

Fill in Project Name, Project No., Contractor, Consultant, Client/Owner, and Location on the Cover tab.

3

Set Each Checklist

Every one of the 17 trade tabs has its own Project / Location / Date / Contractor / Activity Ref. line.

4

Start Inspecting

Work through Hold/Witness points as each trade activity comes up.

Verified editable fields: Project Name, Project No., Contractor, Consultant, Client/Owner, and Location on the Cover tab — plus a Project / Location / Date / Contractor / Activity Ref. line built into every one of the 17 trade checklists.

Start From a Structured Base, Not a Blank Page

Start from a structured 19-tab workbook instead of building 17 trade checklists and cross-referencing standards one at a time.

How It Fits Into the QA/QC Workflow

Part of one coordinated system — plan the inspection, carry it out, document what’s found, track it, and close it out.

1

PLAN

QA/QC ITP Package structures Hold, Witness & Review points before work starts.

2

INSPECT

Field Guide checklists guide the inspection itself, trade by trade.

3

IDENTIFY

NCR Form or QOR Form documents what was found, in the field.

4

TRACK

NCR Log or QOR Log tracks status and days-open automatically, project-wide.

5

CLOSE OUT

Verified sign-off closes the loop — on record, at project closeout.

Who It’s For

QA/QC InspectorsQuality Engineers / ManagersField EngineersProject ManagersContractors

Product Preview

QA/QC ITP Package Premium cover preview

Cover preview shown. Full contents unlock after purchase on Whop.

QA/QC ITP Package Premium

$47.99

Related Products

Retour en haut