QOR Log Premium

Quality Observation Tracking

Track Every Quality Observation Before It Becomes a Bigger Problem

The same live dashboard and automatic status tracking as the NCR Log, tuned for faster-moving observations.

$19.99 Editable Excel (.xlsx) + PDF · Live dashboard

The Problem

Proactive observations are easy to lose track of without a shared log — and without visibility into ageing, an unresolved observation can quietly pass its target date unnoticed.

The Solution

A live sheet with the same automatic dashboard (Total Logged / Open / Overdue / Closed) and automatic Status/Days Open columns as the NCR Log, sized for a higher volume of faster-turnaround items.

What You Receive

What You Receive

  • Editable Excel workbook (.xlsx), 4 tabs: Cover, Instructions, QOR Log, Example
  • Print-ready PDF version
  • Getting Started guide
  • License for use across your own projects

What’s Inside

  • Live dashboard: Total Logged / Open / Overdue / Closed counts, calculated automatically
  • PROJECT, CONTRACTOR, and LOG PERIOD header fields
  • Per-entry columns: Observation Number, Observation Date, Area/Location, Discipline, Description, Criticality (dropdown), Recommended Action, Responsible Party, Target/Actual Close Date, automatic Status & Days Open
  • Instructions page and a worked Example sheet with realistic sample entries

Make It Yours in Minutes

1

Open the File

It’s a fully editable Excel workbook — no macros required.

2

Set Project Details

Fill in PROJECT, CONTRACTOR, and LOG PERIOD on the log sheet.

3

Log Each Observation

One row per QOR — the dashboard and Status/Days Open update automatically.

4

Review at a Glance

Open/Overdue/Closed counts stay visible without manual tallying.

Verified fields: PROJECT, CONTRACTOR, and LOG PERIOD header fields on the log sheet, plus a full per-entry column set (Observation Number, Date, Area/Location, Discipline, Description, Criticality, Recommended Action, Responsible Party, Target/Actual Close Date) with Status and Days Open calculated automatically.

Start From a Structured Base, Not a Blank Page

No manual tallying — Open, Overdue, and Closed counts, plus Days Open per entry, calculate automatically as you log.

How It Fits Into the QA/QC Workflow

Part of one coordinated system — plan the inspection, carry it out, document what’s found, track it, and close it out.

1

PLAN

QA/QC ITP Package structures Hold, Witness & Review points before work starts.

2

INSPECT

Field Guide checklists guide the inspection itself, trade by trade.

3

IDENTIFY

NCR Form or QOR Form documents what was found, in the field.

4

TRACK

NCR Log or QOR Log tracks status and days-open automatically, project-wide.

5

CLOSE OUT

Verified sign-off closes the loop — on record, at project closeout.

Who It’s For

Quality Engineers / ManagersProject ManagersSuperintendents

Product Preview

QOR Log Premium cover preview

Cover preview shown. Full contents unlock after purchase on Whop.

QOR Log Premium

$19.99

Related Products

Retour en haut